Emek Hebrew Academy

Sherman Oaks, CA

Project Details


Emek Hebrew Academy


Jack Hollander & Associates


15365 Magnolia Blvd
Sherman Oaks, CA 91403

Completion Date:

Mon, November 11th, 2002

Emek Hebrew Academy was a design-build middle school project consisting of two buildings and extensive site work. The project was built in multiple phases to keep the school operating during construction. The first building constructed is a 36,000-SF, three-story academic classroom facility. The second building is a 40,000-SF gymnasium. The construction is type 1, structural steel with metal deck and concrete floors. The exterior fa├žade system is plaster over metal studs with glass and aluminum curtain wall/storefront.